Customization: | Available |
---|---|
After-sales Service: | Engineers Available to Service 24/7 Online |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PP-R pipe extrusion line is successfully developed by our company on the basis of many years of development and design experience and production experience, and on the basis of introducing foreign advanced technology, digestion and absorption.
It is suitable for the high-speed production of Ø32 pipe and pipe below Ø32. With two independent control loops, the speed of each pipeline can be controlled and adjusted independently, and the operation is as convenient as a single pipe.It can meet the needs of producing two kinds of pipes with different specifications at the same time.It is suitable for double pipe double layer/multi layer co-extrusion. The equipment has the advantages of simple operation and low failure rate.The equipment has the advantages of less floor area, high energy eficiency and low production cost.
PP-R Pipe Extrusion Line Parameter | ||||||
Model | Production pipe range (mm) | Production Output (kg/h) | Production pipe speed (m/min) | Center height (mm) | Overall dimension (m) | Control system |
SPP-R32S-2 | 2x∅12~∅32 | 300~350 | 2x1~30 | 1000 | 40x3.8x1.8 | Program computer control |
SPP-R32G-2 | 2x∅12~∅32 | 300~350 | 2x1~30 | 1000 | 40x3.8x1.8 |
Debugging before shipping: Before shipping,all the lines will be strictly tested to ensure that customers use smoothly.
Installation at site: strict supervision for installation,commissioning and running.
Customers files establishment: detailed record on customers equipment information,and the replacement of spare parts are kept in profile for a long term save.
Regular visit system:after equipment installation and running,call to customers within one week,life-long follow-up service to the quality of products and services,to ensure that customers are worry-free.
Trouble shoot response time:establish professional sfter-sale service team,after breakdown happened,ensure engineers to provide solution within 24 hours,and solve the problem
Spare parts:Sufficiently supply,delivery in time